SSOAR Logo
    • Deutsch
    • English
  • English 
    • Deutsch
    • English
  • Login
SSOAR ▼
  • Home
  • About SSOAR
  • Guidelines
  • Publishing in SSOAR
  • Cooperating with SSOAR
    • Cooperation models
    • Delivery routes and formats
    • Projects
  • Cooperation partners
    • Information about cooperation partners
  • Information
    • Possibilities of taking the Green Road
    • Grant of Licences
    • Download additional information
  • Operational concept
Browse and search Add new document OAI-PMH interface
JavaScript is disabled for your browser. Some features of this site may not work without it.

Download PDF
Download full text

(2.389Mb)

Citation Suggestion

Please use the following Persistent Identifier (PID) to cite this document:
https://nbn-resolving.org/urn:nbn:de:0168-ssoar-64690-4

Exports for your reference manager

Bibtex export
Endnote export

Display Statistics
Share
  • Share via E-Mail E-Mail
  • Share via Facebook Facebook
  • Share via Bluesky Bluesky
  • Share via Reddit reddit
  • Share via Linkedin LinkedIn
  • Share via XING XING

380-kV-Höchstspannungsleitung Wahle-Mecklar

380 kV high-power voltage line Wahle-Mecklar
[collection article]


This document is a part of the following document:
Raumordnungsverfahren: Grundlagen, Beispiele, Empfehlungen

Worch, Astrid

Corporate Editor
Akademie für Raumforschung und Landesplanung - Leibniz-Forum für Raumwissenschaften

Abstract

Die von der Tennet TSO GmbH geplante 380-kV-Höchstspannungsleitung Wahle-Mecklar ist ein wichtiger Baustein bei der Umsetzung der Energiewende in Deutschland. Angesichts der Raumbedeutsamkeit und der überörtlichen Bedeutung dieses geplanten Neubaus wurde in enger Zusammenarbeit in den Bundesländern ... view more

Die von der Tennet TSO GmbH geplante 380-kV-Höchstspannungsleitung Wahle-Mecklar ist ein wichtiger Baustein bei der Umsetzung der Energiewende in Deutschland. Angesichts der Raumbedeutsamkeit und der überörtlichen Bedeutung dieses geplanten Neubaus wurde in enger Zusammenarbeit in den Bundesländern Niedersachsen und Hessen jeweils ein Raumordnungsverfahren durchgeführt. Die Verfahren wurden im Mai 2010 eingeleitet und im November 2011 abgeschlossen. Für den niedersächsischen Abschnitt wurden mehrere Varianten für die Führung der Leitung von Wahle nach Mecklar im Raumordnungsverfahren auf ihre Raum-, Umwelt- und Natura 2000-Verträglichkeit geprüft. Einige Raumnutzungskonflikte führten im Verfahren zu technischen und planerischen Optimierungsvorschlägen innerhalb der Varianten, die für die landesplanerisch festgestellte Variante in den 21 Maßgaben der Landesplanerischen Feststellung festgeschrieben wurden. Die rund 230 km lange 380-kV-Leitung Wahle-Mecklar hat mittlerweile die Genehmigungsphase erreicht.... view less


The 380-kV high-power voltage line Wahle-Mecklar planned by Tennet TSO GmbH is an important element in the implementation of the energy transition in Germany. In light of the spatial impact and supra-regional significance of this new development, a spatial planning procedure was cooperatively carrie... view more

The 380-kV high-power voltage line Wahle-Mecklar planned by Tennet TSO GmbH is an important element in the implementation of the energy transition in Germany. In light of the spatial impact and supra-regional significance of this new development, a spatial planning procedure was cooperatively carried out in each of the federal states of Lower Saxony and Hessen. The procedures were initiated in May 2010 and concluded in November 2011. For the section of the line in Lower Saxony, several options for the route to be taken from Wahle to Mecklar were assessed in terms of their spatial, environmental and Natura 2000 impact. Several land-use conflicts led to proposals being made within the procedure for the technical and planning optimisation of the variants. For the variant selected by the state planning instance these proposals were then included in the 21 stipulations of the state planning assessment. The approximately 230 km long 380-kV transmission line Wahle-Mecklar is now in the approval phase.... view less

Keywords
zoning; state planning; environmental compatibility; energy supply; space utilization; Federal Republic of Germany

Classification
Area Development Planning, Regional Research

Free Keywords
Höchstspannungsleitung; Raumordnungsverfahren; Umweltverträglichkeitsprüfung; Natura 2000-Verträglichkeit; Variantenvergleich; Beteiligung; Netzausbau; High-power voltage line; spatial planning procedure; Environmental Impact Assessment; Natura 2000 impact; comparing options; participation; grid expansion

Collection Title
Raumordnungsverfahren: Grundlagen, Beispiele, Empfehlungen

Editor
Panebianco, Stefano; Reitzig, Frank; Domhardt, Hans-Jörg; Vallée, Dirk

Document language
German

Publication Year
2019

Publisher
Verl. d. ARL

City
Hannover

Page/Pages
p. 100-108

Series
Arbeitsberichte der ARL, 25

ISSN
2193-1283

ISBN
978-3-88838-419-6

Status
Published Version; peer reviewed

Licence
Creative Commons - Attribution-NoDerivs 3.0


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.
 

 


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.