SSOAR Logo
    • Deutsch
    • English
  • English 
    • Deutsch
    • English
  • Login
SSOAR ▼
  • Home
  • About SSOAR
  • Guidelines
  • Publishing in SSOAR
  • Cooperating with SSOAR
    • Cooperation models
    • Delivery routes and formats
    • Projects
  • Cooperation partners
    • Information about cooperation partners
  • Information
    • Possibilities of taking the Green Road
    • Grant of Licences
    • Download additional information
  • Operational concept
Browse and search Add new document OAI-PMH interface
JavaScript is disabled for your browser. Some features of this site may not work without it.

Download PDF
Download full text

(external source)

Citation Suggestion

Please use the following Persistent Identifier (PID) to cite this document:
https://doi.org/10.14512/rur.1698

Exports for your reference manager

Bibtex export
Endnote export

Display Statistics
Share
  • Share via E-Mail E-Mail
  • Share via Facebook Facebook
  • Share via Bluesky Bluesky
  • Share via Reddit reddit
  • Share via Linkedin LinkedIn
  • Share via XING XING

Planungskonflikte und Partizipation: die Gigafactory Tesla

Planning Conflicts and Participation: the Gigafactory Tesla
[journal article]

Kühn, Manfred

Abstract

Konflikte gelten in der agonistischen Politik- und Planungstheorie als vitale Elemente pluraler Demokratien. Antagonismen sollen gezähmt und in agonistische Auseinandersetzungen kanalisiert werden. Für die Austragung und Regelung von Konflikten kommt den Formen der Partizipation in Planungsverfahren... view more

Konflikte gelten in der agonistischen Politik- und Planungstheorie als vitale Elemente pluraler Demokratien. Antagonismen sollen gezähmt und in agonistische Auseinandersetzungen kanalisiert werden. Für die Austragung und Regelung von Konflikten kommt den Formen der Partizipation in Planungsverfahren eine Schlüsselrolle zu. Die zentrale Frage dieses Beitrages ist die Rolle von Partizipationsverfahren in der Planung, um Konflikte, die in besonderer Schärfe im Kontext von Großprojekten auftreten, auszutragen und zu schlichten. Dargestellt werden Planungskonflikte und Beteiligungsformen am Beispiel der Ansiedlung der Gigafactory Tesla im Land Brandenburg. Im Rahmen einer empirischen Fallstudie werden das Genehmigungsverfahren des Projektes und ein Bebauungsplanverfahren der Gemeinde analysiert. Beide Verfahren sind durch eine große Beschleunigung, frühe Vorentscheidungen und Beteiligungsdefizite gekennzeichnet. Im Ergebnis zeigt sich, dass im Fall der Ansiedlung von Tesla neben Interessen-, Werte- und Standortkonflikten auch Verfahrenskonflikte auftreten, welche die Akzeptanz der Planung infrage stellen. Die praktizierten Formen der Beteiligung erweisen sich als nicht geeignet, um Konflikte zu schlichten, sondern produzieren Misstrauen bei den Gegnern und verstärken antagonistische Dynamiken.... view less


Conflicts are considered as vital elements of plural democracies in agonistic political and planning theory. According to this theory, antagonisms are to be tamed and channeled into agonistic disputes. Therefore, forms of participation in planning procedures play a key role in the resolution and reg... view more

Conflicts are considered as vital elements of plural democracies in agonistic political and planning theory. According to this theory, antagonisms are to be tamed and channeled into agonistic disputes. Therefore, forms of participation in planning procedures play a key role in the resolution and regulation of conflicts. The central question of this paper is the role of participatory procedures in planning in order to resolve and settle conflicts, which occur in a particularly sharp way in the context of large-scale projects. The paper presents planning conflicts and forms of participation using the case of the settlement of the Gigafactory Tesla in the German state of Brandenburg. Within the framework of an empirical case study, the approval procedure of the project and a land use plan procedure of the municipality are analysed. Both procedures are characterized by a great acceleration, early preliminary decisions and participation deficits. The result shows that in the case of the settlement of Tesla, in addition to conflicts of interest, values and location, procedural conflicts also occur, which call the acceptance of planning into question. The forms of participation practiced do not prove suitable for taming conflicts, but rather produce mistrust among opponents and reinforce antagonistic dynamics.... view less

Keywords
spatial planning; planning theory; participation; conflict management; arbitration

Classification
Area Development Planning, Regional Research

Free Keywords
Planungskonflikte; Großprojekte; Beschleunigung

Document language
German

Publication Year
2023

Page/Pages
p. 538-556

Journal
Raumforschung und Raumordnung / Spatial Research and Planning, 81 (2023) 5

ISSN
1869-4179

Status
Published Version; peer reviewed

Licence
Creative Commons - Attribution 4.0


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.
 

 


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.