SSOAR Logo
    • Deutsch
    • English
  • Deutsch 
    • Deutsch
    • English
  • Einloggen
SSOAR ▼
  • Home
  • Über SSOAR
  • Leitlinien
  • Veröffentlichen auf SSOAR
  • Kooperieren mit SSOAR
    • Kooperationsmodelle
    • Ablieferungswege und Formate
    • Projekte
  • Kooperationspartner
    • Informationen zu Kooperationspartnern
  • Informationen
    • Möglichkeiten für den Grünen Weg
    • Vergabe von Nutzungslizenzen
    • Informationsmaterial zum Download
  • Betriebskonzept
Browsen und suchen Dokument hinzufügen OAI-PMH-Schnittstelle
JavaScript is disabled for your browser. Some features of this site may not work without it.

Download PDF
Volltext herunterladen

(externe Quelle)

Zitationshinweis

Bitte beziehen Sie sich beim Zitieren dieses Dokumentes immer auf folgenden Persistent Identifier (PID):
https://doi.org/10.11588/iqas.2017.3-4.7442

Export für Ihre Literaturverwaltung

Bibtex-Export
Endnote-Export

Statistiken anzeigen
Weiterempfehlen
  • Share via E-Mail E-Mail
  • Share via Facebook Facebook
  • Share via Bluesky Bluesky
  • Share via Reddit reddit
  • Share via Linkedin LinkedIn
  • Share via XING XING

Wetland Sanctuary Co-management and Conflict: An Exploratory Study of the Impacts of the Baikka Beel Project in Bangladesh

[Zeitschriftenartikel]

Khan, Nahreen I.
Ahmed, Kawser

Abstract

In 2003, the Government of Bangladesh declared Baikka Beel, a 100-hectare wetland in the north-eastern part of the country, as a permanent wetland sanctuary conservation project intended to preserve its fish breeding and bio-diversity. Within the framework of the Borogangina Resource Management Orga... mehr

In 2003, the Government of Bangladesh declared Baikka Beel, a 100-hectare wetland in the north-eastern part of the country, as a permanent wetland sanctuary conservation project intended to preserve its fish breeding and bio-diversity. Within the framework of the Borogangina Resource Management Organisation, a co-managed project was launched with the support of the USAID. Through a community husbandry initiative several NGOs and one multi-national company also took part in the project. Field research was conducted in 2012 to explore the socio-economic and environmental impacts of the co-managed project. The research revealed that the primary dependent group (i. e. the fishermen) who live in the surrounding vicinity were excluded from the co-management process and that the project impacted their economic, social, political and cultural lives considerably. The top-down approach apparently failed to persuade relevant stakeholders to buy in, resulting in a conflict among three relevant project stakeholder groups as they perceived and pursued their interests on a piecemeal basis.... weniger

Klassifikation
Ökologie und Umwelt

Freie Schlagwörter
Co-management; conflict escalation; natural resource management; Bangladesh

Sprache Dokument
Englisch

Publikationsjahr
2017

Seitenangabe
S. 223-248

Zeitschriftentitel
International Quarterly for Asian Studies (IQAS), 48 (2017) 3-4

Heftthema
Myanmar - Bangladesh - Indonesia - Korea - India

ISSN
2566-6878

Status
Veröffentlichungsversion; begutachtet (peer reviewed)

Lizenz
Creative Commons - Namensnennung, Nicht kommerz., Keine Bearbeitung 4.0


GESIS LogoDFG LogoOpen Access Logo
Home  |  Impressum  |  Betriebskonzept  |  Datenschutzerklärung
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.
 

 


GESIS LogoDFG LogoOpen Access Logo
Home  |  Impressum  |  Betriebskonzept  |  Datenschutzerklärung
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.