SSOAR Logo
    • Deutsch
    • English
  • Deutsch 
    • Deutsch
    • English
  • Einloggen
SSOAR ▼
  • Home
  • Über SSOAR
  • Leitlinien
  • Veröffentlichen auf SSOAR
  • Kooperieren mit SSOAR
    • Kooperationsmodelle
    • Ablieferungswege und Formate
    • Projekte
  • Kooperationspartner
    • Informationen zu Kooperationspartnern
  • Informationen
    • Möglichkeiten für den Grünen Weg
    • Vergabe von Nutzungslizenzen
    • Informationsmaterial zum Download
  • Betriebskonzept
Browsen und suchen Dokument hinzufügen OAI-PMH-Schnittstelle
JavaScript is disabled for your browser. Some features of this site may not work without it.

Download PDF
Volltext herunterladen

(470.0 KB)

Zitationshinweis

Bitte beziehen Sie sich beim Zitieren dieses Dokumentes immer auf folgenden Persistent Identifier (PID):
https://nbn-resolving.org/urn:nbn:de:0168-ssoar-74082-8

Export für Ihre Literaturverwaltung

Bibtex-Export
Endnote-Export

Statistiken anzeigen
Weiterempfehlen
  • Share via E-Mail E-Mail
  • Share via Facebook Facebook
  • Share via Bluesky Bluesky
  • Share via Reddit reddit
  • Share via Linkedin LinkedIn
  • Share via XING XING

The Political Deadlock on the Grand Ethiopian Renaissance Dam

Politischer Stillstand am Grand Ethiopian Renaissance Dam
[Arbeitspapier]

Attia, Hana
Saleh, Mona

Körperschaftlicher Herausgeber
German Institute for Global and Area Studies (GIGA) - Leibniz-Institut für Globale und Regionale Studien, Institut für Afrika-Studien

Abstract

The failure of the latest talks over the Grand Ethiopian Renaissance Dam (GERD) has intensified tensions between Ethiopia and downstream states Egypt and Sudan. What could have been strictly technical negotiations have turned into a political deadlock. The GERD has become a new reality challenging t... mehr

The failure of the latest talks over the Grand Ethiopian Renaissance Dam (GERD) has intensified tensions between Ethiopia and downstream states Egypt and Sudan. What could have been strictly technical negotiations have turned into a political deadlock. The GERD has become a new reality challenging the traditional dynamics in the Nile River Basin. Three key factors can explain the current deadlock. The three parties entered the negotiations with different needs and objectives. These different positions have historical roots and are part of the respective countries' traditional approaches to Nile Basin management. The GERD is situated in a geopolitical hotspot. The region is turning into a competition stage for external actors over its natural resources, such as oil, natural gas, hydropower, and precious metals. It is a region evincing a number of overlapping conflicts, with alliances forming across conflicts that are becoming hard to separate. The region also hosts external armed forces from over a dozen countries, including the United States, France, and China. This creates partisanship in terms of which country external actors support. The domestic costs of the negotiations for the three countries are high. State leaders tied their own hands in the negotiation process by adopting nationalist rhetoric to make domestic gains. The political climate is also fragile, with intra-state and border disputes leading to waning trust and increased accusations of meddling. Since the Ethiopian general elections in June, a window of opportunity has opened. Egypt, Ethiopia, and Sudan should seize it to engage in effective negotiations, as it is the only way forward. The international community, including EU countries with interests in the region, should play an active role to avoid escalation in a fragile region. They should exhaust various foreign policy tools, using a strategy of mixing carrots and sticks.... weniger

Thesaurusschlagwörter
Afrika; Äthiopien; Sudan; Ägypten; natürliche Ressourcen; Region; regionale Entwicklung; USA; China; Frankreich; Verhandlung; politischer Wandel; Wahl

Klassifikation
internationale Beziehungen, Entwicklungspolitik
Friedens- und Konfliktforschung, Sicherheitspolitik

Sprache Dokument
Englisch

Publikationsjahr
2021

Erscheinungsort
Hamburg

Seitenangabe
13 S.

Schriftenreihe
GIGA Focus Afrika, 4

ISSN
1862-3603

Status
Veröffentlichungsversion; begutachtet

Lizenz
Creative Commons - Namensnennung, Keine Bearbeitung 3.0


GESIS LogoDFG LogoOpen Access Logo
Home  |  Impressum  |  Betriebskonzept  |  Datenschutzerklärung
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.
 

 


GESIS LogoDFG LogoOpen Access Logo
Home  |  Impressum  |  Betriebskonzept  |  Datenschutzerklärung
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.