SSOAR Logo
    • Deutsch
    • English
  • English 
    • Deutsch
    • English
  • Login
SSOAR ▼
  • Home
  • About SSOAR
  • Guidelines
  • Publishing in SSOAR
  • Cooperating with SSOAR
    • Cooperation models
    • Delivery routes and formats
    • Projects
  • Cooperation partners
    • Information about cooperation partners
  • Information
    • Possibilities of taking the Green Road
    • Grant of Licences
    • Download additional information
  • Operational concept
Browse and search Add new document OAI-PMH interface
JavaScript is disabled for your browser. Some features of this site may not work without it.

Download PDF
Download full text

(3.377Mb)

Citation Suggestion

Please use the following Persistent Identifier (PID) to cite this document:
https://nbn-resolving.org/urn:nbn:de:0168-ssoar-64686-2

Exports for your reference manager

Bibtex export
Endnote export

Display Statistics
Share
  • Share via E-Mail E-Mail
  • Share via Facebook Facebook
  • Share via Bluesky Bluesky
  • Share via Reddit reddit
  • Share via Linkedin LinkedIn
  • Share via XING XING

Netzanbindung Windpark "Beta Baltic"

The grid connection of the 'Beta Baltic' wind farm
[collection article]


This document is a part of the following document:
Raumordnungsverfahren: Grundlagen, Beispiele, Empfehlungen

Plehn, Matthias

Corporate Editor
Akademie für Raumforschung und Landesplanung - Leibniz-Forum für Raumwissenschaften

Abstract

Das Raumordnungsverfahren für die Netzanbindung des Ostseewindparks "Beta Baltic" wurde im Jahr 2011 durchgeführt. Im Ergebnis des Verfahrens wurde eine Vorzugstrasse für die Kabelverbindung vom geplanten Windpark vor der Insel Fehmarn zum Umspannwerk Bentwisch bei Rostock festgelegt. Der Beitrag be... view more

Das Raumordnungsverfahren für die Netzanbindung des Ostseewindparks "Beta Baltic" wurde im Jahr 2011 durchgeführt. Im Ergebnis des Verfahrens wurde eine Vorzugstrasse für die Kabelverbindung vom geplanten Windpark vor der Insel Fehmarn zum Umspannwerk Bentwisch bei Rostock festgelegt. Der Beitrag beschreibt die wesentlichen Probleme der Trassenführung im see- und landseitigen Bereich und beleuchtet das noch relativ neue Aufgabenfeld der Raumordnung im Meer. Ob und wann "Beta Baltic" oder andere Windparks in der westlichen Ostsee tatsächlich verwirklicht werden, ist auch fünf Jahre nach Abschluss des Raumordnungsverfahrens noch nicht absehbar. Das Beispiel macht anschaulich, wie das Raumordnungsverfahren auf einem frühen, durchaus noch unsicheren Stand der Planung zur Auswahl und Bewertung von Planungsalternativen sowie zur vorläufigen Sicherung geeigneter Trassenkorridore beitragen kann.... view less


The spatial planning procedure assessing the connection of the wind farm "Beta Baltic" to the grid was carried out in 2011. The procedure resulted in the identification of a preferred route for the cable link between the planned wind farm close to the island of Fehmarn in the Baltic Sea and the tran... view more

The spatial planning procedure assessing the connection of the wind farm "Beta Baltic" to the grid was carried out in 2011. The procedure resulted in the identification of a preferred route for the cable link between the planned wind farm close to the island of Fehmarn in the Baltic Sea and the transformer substation Bentwisch near Rostock. The paper describes the main issues confronting the route both at sea and on land and sheds light on the relatively new field of marine spatial planning. Whether and when "Beta Baltic" or other wind farms will actually be developed in the western Baltic Sea remains unclear, even five years after the spatial planning procedure was completed. The example illustrates how in an early and uncertain phase of planning, a spatial planning procedure can aid the choice and evaluation of planning alternatives and the preliminary securing of suitable transmission routes.... view less

Keywords
zoning; energy supply; wind energy; seas; Mecklenburg-Western Pomerania; Federal Republic of Germany; space utilization; state planning

Classification
Area Development Planning, Regional Research

Free Keywords
Raumordnungsverfahren; offshore; Hochspannungskabel; Ostsee; Beta Baltic; spatial planning procedure; high-voltage power cable; Baltic Sea

Collection Title
Raumordnungsverfahren: Grundlagen, Beispiele, Empfehlungen

Editor
Panebianco, Stefano; Reitzig, Frank; Domhardt, Hans-Jörg; Vallée, Dirk

Document language
German

Publication Year
2019

Publisher
Verl. d. ARL

City
Hannover

Page/Pages
p. 60-67

Series
Arbeitsberichte der ARL, 25

ISSN
2193-1283

ISBN
978-3-88838-419-6

Status
Published Version; peer reviewed

Licence
Creative Commons - Attribution-NoDerivs 3.0


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.
 

 


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.