SSOAR Logo
    • Deutsch
    • English
  • English 
    • Deutsch
    • English
  • Login
SSOAR ▼
  • Home
  • About SSOAR
  • Guidelines
  • Publishing in SSOAR
  • Cooperating with SSOAR
    • Cooperation models
    • Delivery routes and formats
    • Projects
  • Cooperation partners
    • Information about cooperation partners
  • Information
    • Possibilities of taking the Green Road
    • Grant of Licences
    • Download additional information
  • Operational concept
Browse and search Add new document OAI-PMH interface
JavaScript is disabled for your browser. Some features of this site may not work without it.

Download PDF
Download full text

(265.6Kb)

Citation Suggestion

Please use the following Persistent Identifier (PID) to cite this document:
https://nbn-resolving.org/urn:nbn:de:0168-ssoar-98972-4

Exports for your reference manager

Bibtex export
Endnote export

Display Statistics
Share
  • Share via E-Mail E-Mail
  • Share via Facebook Facebook
  • Share via Bluesky Bluesky
  • Share via Reddit reddit
  • Share via Linkedin LinkedIn
  • Share via XING XING

Анализ проблем реализации приоритетного направления "персонализированная медицина" в формате проекта полного цикла

Analysis of problems of implementation of the priority direction of "personalized medicine" in the format of full project cycle
[journal article]

Petrov, Andrey N.
Kurakova, Natalia G.
Son, I. M.

Abstract

On an example of a priority direction "the personalized medicine", allocated by Strategy of scientific and technological development of the Russian Federation, risks and barriers of realization of projects of a full cycle are examined. Approaches to design and examination of complex scientific and t... view more

On an example of a priority direction "the personalized medicine", allocated by Strategy of scientific and technological development of the Russian Federation, risks and barriers of realization of projects of a full cycle are examined. Approaches to design and examination of complex scientific and technological projects and to the system of their analytical support are offered. The importance of identifying a qualified customer for full-cycle projects, in the capacity of which either the FEI or a large company interested in developing the priority direction can act, has been substantiated. It was recommended to delegate to a qualified customer the authority to formulate a full cycle project architecture. To minimize and manage a wide range of risks and barriers, that pose a threat to the implementation of all phases of such projects, a multi-parameter expertise is needed, along with an analysis of the trends in the development of a new technology direction, an assessment of economic feasibility, personnel and infrastructure support, adequacy of legal regulation.... view less

Keywords
technical development; project planning; implementation; expertise; Russia

Classification
Sociology of Science, Sociology of Technology, Research on Science and Technology

Free Keywords
priorities of scientific and technological development; full-cycle projects; personalized medicine

Document language
Russian

Publication Year
2017

Page/Pages
p. 74-88

Journal
Ekonomika Nauki / Economics of Science, 3 (2017) 2

DOI
https://doi.org/10.22394/2410-132X-2017-3-2-74-88

ISSN
2410-132X

Status
Published Version; reviewed

Licence
Creative Commons - Attribution-Noncommercial-No Derivative Works 4.0


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.
 

 


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.