SSOAR Logo
    • Deutsch
    • English
  • English 
    • Deutsch
    • English
  • Login
SSOAR ▼
  • Home
  • About SSOAR
  • Guidelines
  • Publishing in SSOAR
  • Cooperating with SSOAR
    • Cooperation models
    • Delivery routes and formats
    • Projects
  • Cooperation partners
    • Information about cooperation partners
  • Information
    • Possibilities of taking the Green Road
    • Grant of Licences
    • Download additional information
  • Operational concept
Browse and search Add new document OAI-PMH interface
JavaScript is disabled for your browser. Some features of this site may not work without it.

Download PDF
Download full text

(3.146Mb)

Citation Suggestion

Please use the following Persistent Identifier (PID) to cite this document:
https://nbn-resolving.org/urn:nbn:de:0168-ssoar-64687-7

Exports for your reference manager

Bibtex export
Endnote export

Display Statistics
Share
  • Share via E-Mail E-Mail
  • Share via Facebook Facebook
  • Share via Bluesky Bluesky
  • Share via Reddit reddit
  • Share via Linkedin LinkedIn
  • Share via XING XING

Pumpspeicherkraftwerk Rio

Pumped-storage power plant Rio
[collection article]


This document is a part of the following document:
Raumordnungsverfahren: Grundlagen, Beispiele, Empfehlungen

Gottreich, Daniela

Corporate Editor
Akademie für Raumforschung und Landesplanung - Leibniz-Forum für Raumwissenschaften

Abstract

Die Energiewende in Deutschland erfordert neben neuen Übertragungsleitungen für regenerativ erzeugten Strom auch den Bau neuer Speicherkraftwerke. Für das bei Trier geplante Pumpspeicherkraftwerk Rio wurde 2012/2013 ein Raumordnungsverfahren durchgeführt. Der folgende Beitrag dokumentiert wesentlich... view more

Die Energiewende in Deutschland erfordert neben neuen Übertragungsleitungen für regenerativ erzeugten Strom auch den Bau neuer Speicherkraftwerke. Für das bei Trier geplante Pumpspeicherkraftwerk Rio wurde 2012/2013 ein Raumordnungsverfahren durchgeführt. Der folgende Beitrag dokumentiert wesentliche Schritte und Inhalte der raumordnerischen Prüfung. Das Verfahrensbeispiel aus Rheinland-Pfalz belegt, dass sich mithilfe von Raumordnungsverfahren eine breite Alternativenprüfung durchführen lässt, die zu einer Entlastung des nachfolgenden Zulassungsverfahrens führen kann. Als weitere Besonderheiten des Raumordnungsverfahrens für das Pumpspeicherkraftwerk Rio benennt der Beitrag unter anderem die Integration eines Zielabweichungsverfahrens und die Bindung des Verfahrensergebnisses an den (künftigen) Stand der Energiespeichertechnik.... view less


The energy transition in Germany requires not only new transmission lines for power produced from renewable sources but also the construction of new storage power plants. A spatial planning procedure was conducted in 2012/13 for the planned pumped-storage power plant located near Trier. This paper d... view more

The energy transition in Germany requires not only new transmission lines for power produced from renewable sources but also the construction of new storage power plants. A spatial planning procedure was conducted in 2012/13 for the planned pumped-storage power plant located near Trier. This paper documents the most important steps and contents of the spatial planning evaluation. The case study from Rhineland-Palatinate demonstrates that a wide range of alternatives can be assessed using a spatial planning procedure, which can ease the pressure on the subsequent approval procedure. The paper also discusses further special features of the spatial planning procedure for the pumped-storage power plant Rio, including the integration of a procedure for derogation from spatial planning goals and the linking of the procedural findings to the (future) status of energy storage technology.... view less

Keywords
zoning; energy supply; renewable energy; hydropower; power plant; state planning; environmental compatibility; Rhineland-Palatinate; Federal Republic of Germany

Classification
Area Development Planning, Regional Research

Free Keywords
Pumpspeicherkraftwerk; Raumordnungsverfahren; Zielabweichungsverfahren; Alternativenprüfung; Energiespeicherung; pumped-storage power plant; spatial planning procedure; procedure for derogation from spatial planning goals; assessment of alternatives; energy storage

Collection Title
Raumordnungsverfahren: Grundlagen, Beispiele, Empfehlungen

Editor
Panebianco, Stefano; Reitzig, Frank; Domhardt, Hans-Jörg; Vallée, Dirk

Document language
German

Publication Year
2019

Publisher
Verl. d. ARL

City
Hannover

Page/Pages
p. 68-76

Series
Arbeitsberichte der ARL, 25

ISSN
2193-1283

ISBN
978-3-88838-419-6

Status
Published Version; peer reviewed

Licence
Creative Commons - Attribution-NoDerivs 3.0


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.
 

 


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.