SSOAR Logo
    • Deutsch
    • English
  • English 
    • Deutsch
    • English
  • Login
SSOAR ▼
  • Home
  • About SSOAR
  • Guidelines
  • Publishing in SSOAR
  • Cooperating with SSOAR
    • Cooperation models
    • Delivery routes and formats
    • Projects
  • Cooperation partners
    • Information about cooperation partners
  • Information
    • Possibilities of taking the Green Road
    • Grant of Licences
    • Download additional information
  • Operational concept
Browse and search Add new document OAI-PMH interface
JavaScript is disabled for your browser. Some features of this site may not work without it.

Download PDF
Download full text

(external source)

Citation Suggestion

Please use the following Persistent Identifier (PID) to cite this document:
https://doi.org/10.22394/1726-1139-2017-6-140-154

Exports for your reference manager

Bibtex export
Endnote export

Display Statistics
Share
  • Share via E-Mail E-Mail
  • Share via Facebook Facebook
  • Share via Bluesky Bluesky
  • Share via Reddit reddit
  • Share via Linkedin LinkedIn
  • Share via XING XING

Планирование трудозатрат на создание и развитие государственных информационных систем и их функциональных программных комплексов

Planning of Labor Costs for Creation and Development of State Information Systems and Their Functional Program Complexes
[journal article]

Naumov, Vladimir
Kucherenko, Dmitry

Abstract

The article considers the means of planning labor expenditures for the creation and development of state information systems and their functional program complexes. To assess the importance and priority of project implementation, the method of KANO needs satisfaction is considered. For the primary a... view more

The article considers the means of planning labor expenditures for the creation and development of state information systems and their functional program complexes. To assess the importance and priority of project implementation, the method of KANO needs satisfaction is considered. For the primary and operational ranking of the requirements for the development of the labor-intensive system, the use of a relative assessment of the forthcoming labor costs in conventional units is considered. To assess the complexity of automation, a cost model for the development of the COCOMO baseline was considered. The application of cluster analysis for the integrated assessment of the requirements for the development of the information system is considered together with the application of the evaluation methodology that takes into account the importance and labor intensity of the relevant information projects. The working capacity of the proposed means is checked on one of the state information systems developed in St. Petersburg with the participation of one of the co-authors.... view less

Keywords
cluster analysis; information system

Classification
Natural Science and Engineering, Applied Sciences

Free Keywords
state information systems; the Kano method; user satisfaction and dissatisfaction; integrated assessment; labor intensity of implementation; cost estimation model for software development COCOMO

Document language
Russian

Publication Year
2017

Page/Pages
p. 140-154

Journal
Administrative Consulting (2017) 6

ISSN
1726-1139

Status
Published Version; reviewed

Licence
Creative Commons - Attribution 4.0


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.
 

 


GESIS LogoDFG LogoOpen Access Logo
Home  |  Legal notices  |  Operational concept  |  Privacy policy
© 2007 - 2025 Social Science Open Access Repository (SSOAR).
Based on DSpace, Copyright (c) 2002-2022, DuraSpace. All rights reserved.